• pumptec2000@yahoo.com
  • 0100 499 0399

REANULT work shop will be safe by Mas fire set

10/25/2008

MAS fire package 110 kw 1250 us gpm at 100m head (elec-diesel-jokey) will erect within 3 months and will make the new building in safe. its, pleasure to put the pictures when arrived